1 June 2026

Net Metering in Bhopal: MPMKVVCL Process, Timeline & Documents (2026)

Step-by-step net-metering process for rooftop solar in Bhopal under MPMKVVCL, application, documents, bidirectional meter, timeline, and how export credits work.

Short answer: In Bhopal, net metering for rooftop solar is processed by MPMKVVCL (the central-MP DISCOM). You apply for feasibility, install through an empanelled vendor, and MPMKVVCL installs a bidirectional meter that credits the surplus solar you export to the grid against the units you draw at night. The full process typically takes a few weeks; WattSprout files all of it for you.

What net metering does

A bidirectional meter runs both ways: it records the solar power you export during the day and the grid power you import at night. You’re billed only on the net, so your daytime surplus offsets your night-time usage. It’s essential to get full value from an on-grid system and is required for the PM Surya Ghar subsidy.

The MPMKVVCL net-metering process in Bhopal

  1. Register & apply for feasibility on the PM Surya Ghar portal with your MPMKVVCL consumer number.
  2. Feasibility approval, MPMKVVCL checks the local transformer/feeder can take the export.
  3. Install through an empanelled vendor (line-itemed BOM, IS-code compliant).
  4. Apply for net metering, submit the installation details.
  5. Inspection & meter installation, MPMKVVCL inspects and fits the bidirectional meter.
  6. Commissioning, system goes live; subsidy is released to your bank account.

Documents you’ll typically need

  • Latest MPMKVVCL electricity bill (consumer number)
  • Identity + address proof
  • Roof ownership / NOC if applicable
  • Vendor’s installation and equipment details

Timeline

Feasibility approval is usually quick; the main wait is the DISCOM inspection and meter installation. Most Bhopal residential connections complete within a few weeks of installation. WattSprout coordinates each step so you’re not chasing the DISCOM yourself.

Common mistakes

  1. Installing before feasibility approval, can cause rework.
  2. Skipping net metering, daytime surplus is wasted and subsidy is at risk.
  3. Wrong consumer details on the portal, delays approval.
  4. Non-empanelled vendor, disqualifies the subsidy.

WattSprout Dynamics handles the full MPMKVVCL net-metering process for Bhopal customers. Request a free survey.

Get a free solar site survey in Bhopal

Sized proposal with the PM Surya Ghar subsidy already applied. Response within 4 hours on working days.

Request a survey →